IT'S ALIVE !!!
MS goes electric
I am 99% complete on my build, just need to re-locate my pulley and move a work bench. My PID parameters are locked in (see post #3 on the controller). I will be doing a test mash and mash-out this weekend.
The element and hot pod was purchased from Bobby @ BrewHardware dot com. I got the stainless steel 5500 watt RIPPLE (see post #2 on the mounting).
I can use the "BobBrews Method" for stabilizing the mash temps, that is, draw out several quarts/liters via the valve and pour over the top. I will have the element turned off during this process. ; http://www.stempski.com/biab.php" onclick="window.open(this.href);return false;
The plan is to turn off the element during the mash, or if needed, run the PID in manual mode at 5% to maintain the mash temp with a stir every 20 minutes.
I plan to mash-out in automatic mode.
Documenting my eBIAB 5.5kw build
Post #1 made 9 years ago
You do not have the required permissions to view the files attached to this post.
Last edited by Mad_Scientist on 22 May 2015, 07:44, edited 9 times in total.
-
- SVA Brewer With Over 100 Brews From United States of America
-